FIELD: construction.
SUBSTANCE: proposed technical solution relates to the field of construction, namely to fasteners for fastening building modular structures and slab building materials, as well as methods for their installation/dismantling. The fastening system of the building structure contains at least one pair of fastening units. The first fastening unit of the pair contains a support sleeve and a guide sleeve interacting with it, provided with support pads, as well as a screw connecting the support and guide sleeves to each other, the second fastening unit of the pair contains an outer sleeve and an inner sleeve interacting with it, equipped with support pads, as well as a means of fastening the inner sleeve to the building structure.
EFFECT: simplifying the design of the fastening system, as well as simplifying the installation/dismantling and increasing the reliability of fastening the building structure, including modular.
13 cl, 5 dwg
Title |
Year |
Author |
Number |
BUILDING STRUCTURE AND BUILDING CONTAINING SUCH STRUCTURE |
2022 |
- Demidov Anton Vladimirovich
- Iora Andrei Petrovich
|
RU2812672C1 |
ELEMENT OF MULTILAYER LIGHT-WEIGHT CONSTRUCTION PANEL, AND ITS MANUFACTURING METHOD |
2012 |
- Dubatovka Igor' Petrovich
- Tverdokhlebov Roman Valentinovich
|
RU2522359C2 |
PRODUCTION LINE FOR MANUFACTURE OF THE LENGTHY BUILDING STRUCTURES AND THE GIRDER, THE BEAM, THE COLUMN MANUFACTURED BY THIS PRODUCTION LINE |
2005 |
- Selivanov Nikolaj Pavlovich
- Shembakov Vladimir Aleksandrovich
|
RU2288840C1 |
METHOD OF MANUFACTURE OF THE LENGTHY BUILDING STRUCTURES, THE LENGTHY BUILDING STRUCTURE AND THE COLUMN MANUFACTURED BY THIS METHOD |
2005 |
- Selivanov Nikolaj Pavlovich
- Shembakov Vladimir Aleksandrovich
|
RU2288839C1 |
FORM FOR ELONGATED BUILDING STRUCTURE, NAMELY GIRDER, BEAM AND COLUMN PRODUCTION, AS WELL AS GIRDERS, BEAMS AND COLUMNS PRODUCED WITH THE USE OF THE FORM |
2005 |
- Selivanov Nikolaj Pavlovich
- Shembakov Vladimir Aleksandrovich
|
RU2304675C2 |
PRODUCTION LINE FOR ELONGATED BUILDING STRUCTURES, PREFERABLY GIRDERS, BEAMS, MANUFACTURING AND GIRDERS AND BEAMS MANUFACTURED WITH THE USE OF SAID PRODUCTION LINE |
2005 |
- Selivanov Nikolaj Pavlovich
- Shembakov Vladimir Aleksandrovich
|
RU2309040C2 |
LINE FOR PRODUCING LONG CONSTRUCTION ARTICLES |
2005 |
- Selivanov Nikolaj Pavlovich
- Shembakov Vladimir Aleksandrovich
|
RU2292262C1 |
ENCLOSING MODULE AND INSTALLATION THEREOF ON READY FRAME OF BUILDING |
2019 |
- Kolodyazhnyj Sergej Aleksandrovich
- Roshchupkin Valerij Nikolaevich
- Gagulaev Aleksej Vladimirovich
- Abramenko Anatolij Aleksandrovich
- Efimov Aleksej Petrovich
- Bujmarova Tatyana Konstantinovna
|
RU2729543C1 |
TECHNOLOGICAL COMPLEX FOR BUILDING STRUCTURE PRODUCTION, ELONGATED BUILDING STRUCTURE AND COLUMN TO BE PRODUCED WITH THE USE OF THE COMPLEX |
2005 |
- Selivanov Nikolaj Pavlovich
- Shembakov Vladimir Aleksandrovich
|
RU2315690C2 |
BUILDING AND METHOD OF BUILDING ERECTION |
2005 |
- Selivanov Nikolaj Pavlovich
- Shembakov Vladimir Aleksandrovich
|
RU2293822C1 |