FIELD: construction.
SUBSTANCE: invention relates to the field of construction in the field of engineering protection of the territory from hazardous geological processes (creeps, landslides, etc.) and hydrotechnical construction of structures using metal sheet pile. Sheet pile wall, completely or partially submerged into soil, contains metal sheet piles with connectors of female and male type for connection of piles to each other into a single sheet pile wall. Lower end of the female-type connector of the pile is equipped with a protective element covering the inner cavity and the slot of the connector, made in the form of a steel plate—a shutter protruding beyond the outer contour of the connector and welded to the lower end on one of its lateral sides.
EFFECT: increased reliability and load capacity of sheet pile wall due to exclusion of soil ingress into internal cavities of pile connectors during submersion and thereby increasing the reliability of the connections of the connectors, as well as reducing the construction time.
5 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
SHEET PILE | 2023 |
|
RU2818614C1 |
TONGUED-AND-GROOVED U-SHAPED POLYHEDRAL PILE | 2022 |
|
RU2799926C1 |
SHEET PILE WALL | 2020 |
|
RU2754744C1 |
SHEET PILE FOR CURVED SHELL CELLS OF HYDRAULIC STRUCTURES AND CURVED SHELL CELL OF HYDRAULIC STRUCTURES | 2023 |
|
RU2802581C1 |
SHEET PILE WALL | 2020 |
|
RU2752974C1 |
CONSTRUCTIVE AND TECHNOLOGICAL SOLUTION FOR FOUNDATION OF INTERMEDIATE SUPPORT OF HIGH PILE WORK TYPE CONSTRUCTED IN TEMPORARY ENCLOSING STRUCTURE | 2023 |
|
RU2807350C1 |
PILOT WALL FOR HYDRO ENGINEERING STRUCTURES | 2022 |
|
RU2789151C1 |
METHOD FOR CONSTRUCTION OF HYDRAULIC STRUCTURES ON ROCKY SOILS | 2023 |
|
RU2816995C1 |
METHOD FOR TRESTLE-TYPE BERTH STRUCTURE RECONSTRUCTION | 2003 |
|
RU2281358C2 |
HYDRAULIC STRUCTURE AND METHOD OF ITS INSTALLATION | 2023 |
|
RU2820942C1 |
Authors
Dates
2024-02-12—Published
2023-04-07—Filed