FIELD: metallurgy. SUBSTANCE: the furnace charge is melted and the blank consisting of iron and pieces of carbon-containing material is brought in at a relation of (6-8):1, metal is finished. EFFECT: considerable saving of electric power due to the increase of frothing of slags and increase of completeness of arc screening by slag. 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MELTING OF CARBONIC AND LOW ALLOYED GRADES OF STEEL | 2006 |
|
RU2336310C2 |
PROCESS FOR PREPARING FOAMED SLAG AND KEEPING ITS DENSITY AND OTHER PROPERTIES ON THE WHOLE SURFACE OF MELT IN BATH AT MELTING STEEL IN ELECTRIC ARC FURNACE | 2004 |
|
RU2276693C1 |
METHOD OF STEEL PRODUCTION IN ELECTRIC ARC FURNACE | 2015 |
|
RU2610975C2 |
FILLER FOR MATERIAL DESTINED FOR METALLURGICAL PRODUCTION AND METHOD FOR PREPARING FILLER FOR MATERIAL DESTINED FOR METALLURGICAL PRODUCTION | 2000 |
|
RU2170270C1 |
STEEL PRODUCTION METHOD AND LINE | 1994 |
|
RU2092572C1 |
STEEL-MAKING METHOD IN ELECTRIC FURNACE | 2008 |
|
RU2374329C1 |
METHOD OF MELTING VANADIUM-CONTAINING STEEL IN ELECTRIC ARC FURNACE | 1996 |
|
RU2102497C1 |
METHOD OF MELTING OF LOW-CARBON STEEL | 1995 |
|
RU2087545C1 |
CHARGE BRIQUETTE FOR PRODUCTION OF HIGH-GRADE STEEL AND METHOD OF CHARGE BRIQUETTE PREPARATION | 1999 |
|
RU2150514C1 |
COMPOSITION OF CONDITIONING ADDITION FOR SLAG, METHOD FOR ITS OBTAINING, AND METHOD OF ITS APPLICATION DURING STEEL MAKING | 2005 |
|
RU2404264C2 |
Authors
Dates
1995-01-09—Published
1991-06-05—Filed