FIELD: pipe erection. SUBSTANCE: pipeline saddle has lower section 2 restrained in soil and upper section 1 with a bed for pipeline 4. Springs 3 are placed between the saddle sections. The upper section is secured by anchors 6. At frost soil heaving the lower section of the block rises comprising spring 3. EFFECT: enhanced reliability. 1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| ABOVE GROUND PIPELINE SUPPORT | 2022 |
|
RU2781733C1 |
| SUPPORT OF PIPELINE | 1998 |
|
RU2124668C1 |
| POLE FOR OVERHEAD SYSTEM TO BE ERECTED IN HEAVING GROUND | 2006 |
|
RU2317375C2 |
| METHOD FOR PROTECTING THE BEARING SUPPORT STRUCTURE OF ABOVE-GROUND MAIN PIPELINE FROM THE IMPACT OF THE FORCES OF FROSTY HEAVING OF SOIL | 2022 |
|
RU2785329C1 |
| METHOD OF TREATING WOODEN PILE BASE WITH ANTI-HEAVING COATING | 2023 |
|
RU2826072C1 |
| CATENARY LINE SUPPORT ON SLOPE AND DECLIVITY ERECTED ON HEAVING SOILS | 2018 |
|
RU2697755C1 |
| WOODEN PILE BASE WITH COATING FOR INSTALLATION IN HEAVING SOILS | 2023 |
|
RU2822185C1 |
| PILE WITH INCREASED RESISTANCE TO SWELLING | 2010 |
|
RU2441115C1 |
| HEAT-INSULATED FOUNDATION | 1998 |
|
RU2135693C1 |
| FOUNDATION ON HEAVING SOILS | 2014 |
|
RU2550169C1 |
Authors
Dates
1996-03-20—Published
1993-03-01—Filed