FIELD: civil engineering. SUBSTANCE: short pile with support members in upper portion is used to line well mouth. Reinforcing rod and plate are used at lower end. Addition pile is secured to support members of the short pile. Reinforcing rod is installed into the well prior or after filling the well and piles with hardening material. Vibration effect is applied twice. The first vibration effect is applied before hardening material, and vibration is applied to reinforcing rod and well bottom ground. The second vibration effect is applied after at least three days after hardening start to transmit vibrations through additional pile to hardening material and surrounding ground. EFFECT: increased bearing capacity. 4 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCING PILES IN GROUND | 1995 |
|
RU2081242C1 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
METHOD FOR ERECTION OF GUARDING WALL IN EARTH | 1996 |
|
RU2095520C1 |
GROUND ANCHOR OR DRILLING PILE AND MANUFACTURING METHOD OF GROUND ANCHOR OR DRILLING PILE | 2013 |
|
RU2543842C1 |
METHOD FOR ENFORCEMENT OF BUILDING FOUNDATION | 1995 |
|
RU2081245C1 |
METHOD FOR MANUFACTURING OF FOUNDATION FROM BORING PILES | 2009 |
|
RU2403341C1 |
METHOD OF PILE CONSTRUCTION | 2001 |
|
RU2205262C2 |
METHOD FOR MAKING PILE IN GROUND | 1995 |
|
RU2081969C1 |
METHOD TO ERECT BORED PILE | 2012 |
|
RU2514079C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
Authors
Dates
1997-06-10—Published
1995-07-12—Filed