FIELD: civil engineering. SUBSTANCE: metal bar is secured to rod with primary bend towards well wall. Lower end of the bar is secured to the rod immovably over the tool. Upper end is secured by movable holder so as to be moved over axis along the rod. Hardening material is put to the well with the tool being in lower position. On filling well up with hardening material, force effect is applied to movable holder, then holder is moved down along rod to bend of metal bar, and until bar bend is introduced in well wall. Then movable holder position and bar position are fixed. Rod is rotated to form well widening. Then movable holder is released and moved upward until rod comes straight. Then the tool is withdrawn, and reinforcing skeleton is installed in it prior to hardening. EFFECT: higher bearing capacity. 4 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCING PILES IN GROUND | 1995 |
|
RU2081241C1 |
METHOD FOR ERECTION OF GUARDING WALL IN EARTH | 1996 |
|
RU2095520C1 |
GROUND ANCHOR OR DRILLING PILE AND MANUFACTURING METHOD OF GROUND ANCHOR OR DRILLING PILE | 2013 |
|
RU2543842C1 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
METHOD FOR ENFORCEMENT OF BUILDING FOUNDATION | 1995 |
|
RU2081245C1 |
METHOD OF PILE CONSTRUCTION | 2001 |
|
RU2205262C2 |
METHOD FOR MAKING PILE IN GROUND | 1995 |
|
RU2081969C1 |
REINFORCEMENT OF VERTICAL PILES MADE IN SOIL AND PERCEIVING INDENTATION LOADS | 2010 |
|
RU2465403C2 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD TO ERECT BORED PILE | 2012 |
|
RU2514079C1 |
Authors
Dates
1997-06-10—Published
1995-07-12—Filed