FIELD: oil industry. SUBSTANCE: method implies arrangement of second hole for liquidation of breakdown damage in oil well. For efficient operation with second hole, necessary is preliminary decision about feasibility of second hole, and decision is based on amount of residual extracted product. At point of opening of oil reservoir by second hole there must be maximal oil saturation at minimal flooding and low embracing by filtration. For determining predictable output, additionally carried out are field and laboratory filtration investigations with plotting diagrams of relative phase permeabilities and relations of product flooding F and relative productivity θ against water saturation of bottom-hole zone, and also changes of relative productivity of well. Determined according to Leveret function are water saturation in area of breakdown well, rate of dropping productivity of breakdown well and its specific potential productivity K
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR IMPROVING INFLOW OF OIL OF CRITICAL ZONE TREATMENT | 1994 |
|
RU2064574C1 |
METHOD FOR AFTER-EXPLOITATION OIL DEPOSIT | 1994 |
|
RU2072033C1 |
METHOD OF CONTROL OVER DEVELOPMENT OF OIL DEPOSIT WITH FORMATIONS NONUNIFORM IN BEDDING | 1998 |
|
RU2148169C1 |
METHOD FOR CONTROL OF DEVELOPMENT OF OIL POOLS WITH THE HELP OF MAPS OF RESIDUAL OIL-SATURATED STRATA | 1997 |
|
RU2122107C1 |
METHOD FOR FINAL DEVELOPMENT OF OIL DEPOSIT AT CONCLUDING STAGE OF OPERATION | 1996 |
|
RU2116436C1 |
METHOD FOR MONITORING DEVELOPMENT OF OIL DEPOSITS | 1997 |
|
RU2119583C1 |
METHOD OF DEVELOPING OIL DEPOSIT | 1997 |
|
RU2135753C1 |
POLYMERIC-DISPERSED COMPOSITION FOR INCREASED OIL PRODUCTION | 1993 |
|
RU2061855C1 |
METHOD FOR DEVELOPMENT OF OIL FIELD AT FINAL STAGE WITH THE HELP OF FORCED WITHDRAWAL | 1996 |
|
RU2120543C1 |
METHOD FOR DEVELOPING MULTIPLE-BED OIL DEPOSIT BY SYSTEM OF HORIZONTAL WELLS | 1995 |
|
RU2093669C1 |
Authors
Dates
1997-08-20—Published
1994-04-26—Filed