FIELD: oil-producing industry; methods for control of oil pools development. SUBSTANCE: method includes geological field research of wells and laboratory investigations of properties of formation fluids and porous media; calculation of residual oil-saturated strata in the nearest surroundings of i-well by water cutting of its production using for the purpose of Bacley-Leverett relationships; reestablishment of the field of residual oil-saturated strata in arbitrary point of well with consideration of the results of current geological field researches of wells and engineering geological measures; additional construction of maps of initial oil-saturated strata; determination of volumes of accumulated recovered oil for producing wells and volume of injections for injection wells and distribution of permeability by interbeds and contributions of operating wells in formation of field of residual oil-saturated strata. This is determined as a function depending on adjusting parameter, distance from i-well to arbitrary point of pool, accumulated recovered oil volume, and volume of injections, residual oil-saturated strata in the nearest surroundings of i-well with consideration of distribution of permeability by interbeds. Residual oil-saturated strata are calculated in arbitrary point of pool and filed of residual oil-saturated strata is reestablished by selection of adjusting parameter by iteration system with consideration of fulfillment of balance relationship. EFFECT: higher confidence of method due to consideration of contribution of operating wells in formation of field of residual oil-saturated strata. 4 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONTROL OVER DEVELOPMENT OF OIL DEPOSIT WITH FORMATIONS NONUNIFORM IN BEDDING | 1998 |
|
RU2148169C1 |
METHOD OF CONTROL OF DEVELOPMENT OF DEPOSITS WITH THE ESTIMATION OF DEVELOPMENT OF VISCOUS PLASTIC OIL RESERVES AT THE STAGE OF WATERING OF THE PLATE | 2017 |
|
RU2682830C1 |
METHOD FOR MONITORING DEVELOPMENT OF OIL DEPOSITS | 1997 |
|
RU2119583C1 |
METHOD FOR AFTER-EXPLOITATION OIL DEPOSIT | 1994 |
|
RU2072033C1 |
PROCESS MONITORING EXPLOITATION OF OIL FIELDS | 1998 |
|
RU2135766C1 |
METHOD TO CONTROL STACKED POOL OIL DEPOSIT DEVELOPMENT WITH THE USE OF RESIDUAL NET OIL MAPS | 2005 |
|
RU2285790C1 |
METHOD OF DEVELOPING OIL DEPOSIT | 1997 |
|
RU2135753C1 |
METHOD FOR DETERMINING GEOLOGICAL AND PHYSICAL PROPERTIES OF FORMATION AND OIL RESERVES | 2022 |
|
RU2789872C1 |
METHOD FOR LIQUIDATION OF BREAKDOWN DAMAGE IN OIL WELLS | 1994 |
|
RU2087670C1 |
METHOD FOR FINAL DEVELOPMENT OF OIL DEPOSIT AT CONCLUDING STAGE OF OPERATION | 1996 |
|
RU2116436C1 |
Authors
Dates
1998-11-20—Published
1997-05-22—Filed