FIELD: electrometallurgy; applicable in, smelting of ferroalloys. SUBSTANCE: the offered method includes continuous supply to furnace of metering charge shaped in form of cones round electrodes and periodic metal tapping. In so doing, 10-45 min before metal tapping, silicon-containing pellets are supplied to charge in portions. In this case, pellets are supplied to region of electrodes of the second and third phases. EFFECT: higher productivity of furnace with reduced power consumption. 5 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
CHARGE FOR SMELTING FERROSILICON | 1997 |
|
RU2106423C1 |
CHARGE FOR SMELTING FERROSILICON | 1997 |
|
RU2106424C1 |
METHOD OF SMELTING OF FERROSILICON IN ORE-SMELTING FURNACE | 1996 |
|
RU2096514C1 |
MIXTURE FOR MELTING OF FERROSILICIUM | 1996 |
|
RU2094518C1 |
METHOD FOR PRODUCTION OF FERROALLOY CONTAINING MANGANESE AND SILICON | 1993 |
|
RU2061779C1 |
METHOD OF PRODUCING FUSED FLUX | 1997 |
|
RU2124972C1 |
METHOD OF PRODUCING FERROSILICON IN CLOSED ORE-THERMAL FURNACES | 2019 |
|
RU2714561C1 |
METHOD OF SMELTING FERROSILICOMANGANESE | 2001 |
|
RU2190683C1 |
CHARGE FOR PRODUCTION OF FERROSILICON | 1994 |
|
RU2109836C1 |
METHOD OF PREPARING FERROSILICOVANADIUM | 1998 |
|
RU2147043C1 |
Authors
Dates
1998-05-27—Published
1997-03-19—Filed