FIELD: metallurgy; may be used in manufacture of blast-furnace tuyeres. SUBSTANCE: method includes deposition of aluminum-containing coating by spraying onto mouth part, external sleeve and weld connecting them. Coated tuyere together with furnace is heated; after annealing it is cooled in furnace. In so doing, thickness of coating of the mouth part and external sleeve is not less than 0.4 mm, and that of weld between mouth part and external sleeve is not less than 0.5 mm. EFFECT: higher productivity of process. 1 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARING TUYERE OF BLAST FURNACE FOR OPERATION | 1998 |
|
RU2132391C1 |
METHOD FOR PREPARING BLAST FURNACE TUYERE FOR OPERATION | 1998 |
|
RU2147614C1 |
METHOD OF PREPARATION OF BLAST FURNACE TUYERE FOR OPERATION | 2001 |
|
RU2215043C2 |
METHOD OF PREPARATION OF BLAST FURNACE AIR TUYERE FOR OPERATION | 2006 |
|
RU2325444C2 |
BLAST-FURNACE TUYERE | 1997 |
|
RU2124054C1 |
TUYERE OF BLAST FURNACE | 1999 |
|
RU2153001C1 |
PREPARATION METHOD OF AIR TUYERE OF BLAST FURNACE FOR OPERATION | 2011 |
|
RU2465333C2 |
BLAST FURNACE TUYERE AND METHOD FOR MAKING WELDED SEAM OF TUEYRE | 1995 |
|
RU2088671C1 |
BLAST FURNACE TUYERE | 1999 |
|
RU2167204C1 |
METHOD FOR PREPARING OF BLAST FURNACE TUYERE FOR OPERATION | 2005 |
|
RU2303636C2 |
Authors
Dates
1998-07-20—Published
1997-06-26—Filed