FIELD: metallurgy. SUBSTANCE: method involves subjecting outer surface of furnace tuyere to metallic shotblasting; applying coat by gas-and-thermal method: first onto outer sleeve, then moving gradually to front end of tuyere; conducting thermal treatment at least 5 hours after application of coat. EFFECT: improved quality of tuyere, reduced labour consumption and increased efficiency. 4 cl, 1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARATION OF BLAST FURNACE TUYERE FOR OPERATION | 2001 |
|
RU2215043C2 |
METHOD OF PREPARATION FOR OPERATION OF BLAST-FURNACE TUYERE | 1997 |
|
RU2115740C1 |
METHOD OF PREPARING TUYERE OF BLAST FURNACE FOR OPERATION | 1998 |
|
RU2132391C1 |
PREPARATION METHOD OF AIR TUYERE OF BLAST FURNACE FOR OPERATION | 2011 |
|
RU2465333C2 |
METHOD FOR PREPARING OF BLAST FURNACE TUYERE FOR OPERATION | 2005 |
|
RU2303636C2 |
BLAST FURNACE TUYERE PREPARATION METHOD | 2008 |
|
RU2387716C2 |
METHOD FOR PREPARING AIR TUYERE OF BLAST FURNACE FOR OPERATION | 2004 |
|
RU2260058C1 |
METHOD FOR PREPARING OF BLAST FURNACE TUYERE FOR OPERATION | 2005 |
|
RU2308491C2 |
METHOD OF PREPARATION OF BLAST FURNACE AIR TUYERE FOR OPERATION | 2006 |
|
RU2325444C2 |
METHOD OF PREPARING TO OPERATION AND INSTALLATION OF BLAST FURNACE AIR TUYERE | 2006 |
|
RU2327742C2 |
Authors
Dates
2000-04-20—Published
1998-11-30—Filed