FIELD: construction, in particular, reconstruction of architecture monuments in correction of leaning long walls to vertical position. SUBSTANCE: method includes fixing of walls, reinforcing of ground base, reinforcing of foundation and turning of wall. Hinged to foundation at right angle is triangular member whose upper free end rests on system of distributing device, and applied to lower free end of truss with the help of jack is vertical force which is transmitted through distributing device to a large number of points up to correction of wall leaning and its return to vertical position. EFFECT: simplification of method; reduced energy consumption and labor input in performance of work. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE CONTROLLING LIST AND SINKING OF SOLID MASS STRUCTURE | 2001 |
|
RU2211288C2 |
METHOD TO REINFORCE BUILDING OR STRUCTURE | 2011 |
|
RU2463419C1 |
METHOD TO REINFORCE BRICKWORK PILLARS AND THEIR COLUMNAR FOUNDATIONS | 2015 |
|
RU2600473C1 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD FOR STABILIZING CONSTRUCTION OF HISTORICAL STRUCTURES | 1995 |
|
RU2123567C1 |
STONE FOUNDATION RECONSTRUCTION METHOD | 2004 |
|
RU2268962C1 |
METHOD TO BALANCE MONOLITHIC REINFORCED CONCRETE STRUCTURES | 2010 |
|
RU2426837C1 |
DEVICE FOR REINFORCING FOUNDATIONS OF THE EXISTING BUILDINGS AND STRUCTURES | 1993 |
|
RU2074287C1 |
METHOD FOR FOUNDATION ENHANCING | 2015 |
|
RU2596621C1 |
Authors
Dates
1998-11-20—Published
1996-06-18—Filed