FIELD: oil production industry. SUBSTANCE: according to method, pressure of oil bed in well zone is reduced. Well is then filled with raw degassed dewatered oil taken from given deposit. Perforation procedure is performed in oil medium. Used in completion of well is steam-air mixture at relation of steam and air volumes of 1:(5-15). This steam-air mixture is pumped through starting coupling. Application of aforesaid method enhances efficiency of completing oil wells with retaining their productive capacity. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
WELL PLUGGING METHOD | 1998 |
|
RU2123580C1 |
METHOD FOR HYDRAULIC FRACTURING OF OIL BED | 1998 |
|
RU2123587C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1998 |
|
RU2123584C1 |
METHOD FOR DEVELOPMENT OF LINEAR OIL BED | 1998 |
|
RU2123585C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1998 |
|
RU2123581C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF WELL | 1998 |
|
RU2124631C1 |
METHOD FOR DEVELOPMENT OF OIL-GAS-CONDENSATE DEPOSIT | 1998 |
|
RU2123583C1 |
METHOD FOR WELL DEVELOPMENT | 2011 |
|
RU2447277C1 |
METHOD FOR CLEANING FACE-ADJACENT BED AREA | 2003 |
|
RU2246610C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT | 2003 |
|
RU2243374C1 |
Authors
Dates
1999-01-10—Published
1998-06-26—Filed