HOT-WATER BOILER HOUSE Russian patent published in 1999 - IPC

Abstract RU 2137984 C1

FIELD: heat-power engineering; heat supply systems. SUBSTANCE: hot-water boiler house has at least one hot-water boiler, water-to-water heat exchanger, make-up water vacuum deaerator with feed water, heating agent and deaerated make-up water pipe lines; last pipe line is connected to circulating pipe line through storage tank and make-up pump. Hot-water boiler, water-to-water heat exchanger and circulating pump are interconnected by means of pipe lines forming closed circulating loop. Heating agent pipe line of vacuum deaerator is connected to supply pipe line through additional water-to-water heat exchanger which is connected to pipe line of closed circulating loop at outlet of hot-water boiler and before circulating pump. EFFECT: enhanced reliability and economical efficiency. 1 dwg

Similar patents RU2137984C1

Title Year Author Number
METHOD OF OPERATION OF HOT-WATER BOILER HOUSE 1998
  • Sharapov V.I.
  • Orlov M.E.
RU2137985C1
THERMAL POWER PLANT 1999
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2159337C1
THERMAL POWER PLANT 1999
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2159336C1
BOILER PLANT FOR OPEN-TYPE HEAT SUPPLY SYSTEM 1998
  • Sharapov V.I.
RU2147715C1
PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184309C1
HEATING BOILER ROOM 1997
  • Sharapov V.I.
  • Rotov P.V.
RU2147714C1
PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184315C1
PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184311C1
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2184310C1
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT 2000
  • Sharapov V.I.
  • Orlov M.E.
  • Rotov P.V.
RU2189525C2

RU 2 137 984 C1

Authors

Sharapov V.I.

Orlov M.E.

Dates

1999-09-20Published

1998-09-11Filed