FIELD: heat-power engineering; preparation of make-up water for heating systems. SUBSTANCE: method of operation of peak-load boiler plant includes heating of heating-system water in hot-water boiler and directing said water to consumers; leakage of heating-system water is compensated by make-up water; to said end, starting water and heating agent are fed to deaerator; deaerated make-up water is directed to heating-system pipe line and is used as heating agent for vacuum deaerator. Deaerated make-up water (before supply to heating-system pipe line and vacuum deaerator) and strating water (before supply to vacuum deaerator) are heated in succession by waste gases of hot-water boiler; deaerated make-up water is heated first. EFFECT: enhanced economical efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184310C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184312C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184315C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184309C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184311C1 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184313C1 |
BOILER AGGREGATE OPERATION METHOD | 2002 |
|
RU2209376C1 |
PEAK-LOAD HOT-WATER BOILER PLANT | 2000 |
|
RU2184314C1 |
BOILER AGGREGATE | 2002 |
|
RU2209375C1 |
METHOD OF OPERATION OF HOT-WATER BOILER HOUSE | 1998 |
|
RU2137985C1 |
Authors
Dates
2002-09-20—Published
2000-11-10—Filed