FIELD: construction engineering. SUBSTANCE: device relates to metal crane-runway structure with heavy-duty operation. Device has crane-runway girders 3 which carry three-head rail 1, brake girders 12 with horizontal plate, supports of crane-runway girder which are horizontally connected by studs 11 with column. Horizontal plate converts at right into channel bar 13 which is located between upper girth of crane-runway girder and longitudinal rib 5 created by bending of web of crane-runway girder. Located at left is channel bar which is attached to column by hinge 15 symmetrically to channel 13. Clearance between lower girth of girder and plate of column step is equal to 2-3 thicknesses of lower girth of crane-runway girder. Symmetrical shock absorbers 9 are used as supports of crane-runway girder. Application of aforesaid embodiment of device allows for reducing metal-input together with prolonging service life. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
CRANE RUNWAY STRENGTHENING METHOD | 1994 |
|
RU2114045C1 |
CRANE RUNWAY BEAM-TO-COLUMN CONNECTION UNIT | 2000 |
|
RU2192384C2 |
METHOD AND DEVICE FOR STRENGTHENING OF DOUBLE-TEE CRANE-RUNWAY GIRDER | 1995 |
|
RU2126768C1 |
REHABILITATION METHOD OF WELDING CRANE BEAM DAMAGED WITH FATIGUE CRACKS | 2009 |
|
RU2460621C2 |
RAIL-AND-BEAM STRUCTURE | 2000 |
|
RU2191155C2 |
METAL CRANE RUNWAY STRUCTURE | 1992 |
|
RU2095527C1 |
PARALLEL CRANE GIRDERS REINFORCEMENT METHOD | 1996 |
|
RU2128620C1 |
METHOD OF REDUCING THE SERVICE LIFE OF THE EMERGENCY RUNWAY BEAMS | 2014 |
|
RU2583116C2 |
CRANE RUNWAY | 1993 |
|
RU2067075C1 |
CRANE RUNWAY METAL STRUCTURE | 1998 |
|
RU2196097C2 |
Authors
Dates
1999-11-20—Published
1995-10-09—Filed