FIELD: repair production. SUBSTANCE: method includes installation of strengthening sheet with rounded edges and holes at place of deformation. Sheet width exceeds that of lower boom. The method also includes welding of sheet to lower boom and auxiliary connection of sheet to lower boom by means of connecting members in the form of bushings which are positioned in sheet holes and welded round to both lower boom surface inside bushing and sheet surface outside bushing. EFFECT: higher operational reliability. 3 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
LOAD BEAM REPAIR METHOD | 2004 |
|
RU2279959C1 |
ERECTION METHOD FOR STEEL BEAM OF BRIDGE FRAMEWORK | 2003 |
|
RU2230851C1 |
METHOD FOR LATTICE SPAN STRUCTURE DISASSEMBLING BY SPAN STRUCTURE DIVISION INTO THREE-DIMENSIONAL BLOCKS | 2006 |
|
RU2304656C1 |
BRIDGE SPAN STRUCTURE ERECTION METHOD | 2005 |
|
RU2280121C1 |
JOINING DEVICE OF SECTIONAL REINFORCED CONCRETE SLAB IN STEEL AND REINFORCED CONCRETE BRIDGE | 1997 |
|
RU2133792C1 |
METHOD OF REINFORCEMENT OF BUILDING FOUNDATION AND DEVICE FOR ITS EMBODIMENT | 2001 |
|
RU2191235C1 |
GANTRY CRANE | 2000 |
|
RU2179145C1 |
PROTECTIVE CASE FOR BRIDGE PIER GRILLAGE AND ERECTION METHOD THEREOF | 2004 |
|
RU2263176C1 |
BRIDGE SPAN STRUCTURE | 2005 |
|
RU2280122C1 |
METHOD OF RESTORING CAMBER OF METAL SPAN BEAMS OF BOX-SECTION | 2018 |
|
RU2676781C1 |
Authors
Dates
2000-03-27—Published
1998-08-07—Filed