FIELD: rail track facilities. SUBSTANCE: machine has railway platform 1 with four mechanisms 4 for drawing spikes 40 placed on external side of track, and engine whose flywheel 2 is provided with cams for engaging rod 5 of mechanisms 4. Rod 5 is mounted on platform for displacement in vertical and horizontal planes. EFFECT: improved efficiency of track maintenance operations. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR PULLING OUT SPIKES | 1998 |
|
RU2141548C1 |
CLAMP BOLT TIGHTENING CHECK METHOD | 2000 |
|
RU2188887C2 |
RAILWAY TRACK SPIKE | 1996 |
|
RU2129184C1 |
ANTI-CREEPING SPIKE FASTENING | 2000 |
|
RU2183700C2 |
METHOD OF CUTTING OUT DEFECTIVE SECTIONS IN CONTINUOUS TRACK RAILS | 2000 |
|
RU2186166C2 |
DEVICE FOR REPLACING CAR BOGIES | 1997 |
|
RU2130394C1 |
TIE SHIFTER | 2001 |
|
RU2194819C1 |
FACILITY TO REMOVE UNSERVICEABLE SUPPORTS OF CONTACT SYSTEM | 2001 |
|
RU2204654C2 |
DEVICE FOR ITEM-BY-ITEM PUTTING OUT ARTICLES FROM PACK | 1998 |
|
RU2150421C1 |
UNIT FOR SINGLE REPLACEMENT OF SLEEPERS | 2018 |
|
RU2696542C1 |
Authors
Dates
2001-02-10—Published
1999-04-13—Filed