FIELD: railway track maintenance machinery and equipment. SUBSTANCE: device has support 1 with its upper end being connected by means of pin 2 with lever 3. End of lever is made in the form of drum. Grip 7 is secured in holes 6 of drum shoulders by means of flexible link 8. Application of aforesaid embodiment of device prevents deformation of spike being drawn. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
SPIKE DRAWING MACHINE | 1999 |
|
RU2162908C2 |
RAILWAY TRACK SPIKE | 1996 |
|
RU2129184C1 |
CLAMP BOLT TIGHTENING CHECK METHOD | 2000 |
|
RU2188887C2 |
TRACK SPIKE | 2000 |
|
RU2180377C2 |
ANTI-CREEPING SPIKE FASTENING | 2000 |
|
RU2183700C2 |
DEVICE FOR ITEM-BY-ITEM DELIVERY OF RAIL BASEPLATE FROM PILE | 1999 |
|
RU2160221C2 |
BALLAST CLEANER | 2000 |
|
RU2178474C2 |
FACILITY TO REMOVE UNSERVICEABLE SUPPORTS OF CONTACT SYSTEM | 2001 |
|
RU2204654C2 |
INTERMEDIATE SEPARATE RAIL FASTENING FOR HIGH-SPEED RAILWAY LINES | 2002 |
|
RU2221099C2 |
DEVICE FOR ITEM-BY-ITEM DELIVERY OF RAIL BASEPLATES FROM PILE | 1998 |
|
RU2152346C1 |
Authors
Dates
1999-11-20—Published
1998-04-03—Filed