FIELD: mining industry, applicable in exploitation of flooded massifs. SUBSTANCE: the method consists in formation of pit cavities in the lower part of the holes and in charging of them with water-resistant explosive to a height not exceeding the level of flooding for displacement of water from the hole with a subsequent after- charging of holes with hydrolabile explosives in a time interval equal to 0.8 to 1 day. EFFECT: reduced expenditures connected with blasting.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DRILLING AND BLASTING OPERATIONS IN OPEN CUTS | 1999 |
|
RU2154254C1 |
METHOD OF HOLE CHARGING | 1997 |
|
RU2133942C1 |
EXPLOSIVE COMPOSITION AND A METHOD OF PREPARING BOREHOLE CHARGE | 2001 |
|
RU2205168C1 |
METHOD OF CHARGING WATER PRODUCING WELLS WITH BULK SOLID HYDROLABILE EXPLOSIVE SUBSTANCES (VERSIONS) | 2007 |
|
RU2341767C1 |
DEVICE FOR CHARGING OF HOLES WITH RUNNING WATER ON OPEN PITS BY NONWATER PROOF EXPLOSIVES AND METHOD FOR ITS USE | 2002 |
|
RU2232372C1 |
PROCESS OF DRYING-UP AND LOADING OF BOREHOLES | 1998 |
|
RU2130584C1 |
METHOD OF CHARGING OF DESCENDING BLAST HOLES WITH HOT-FLOWING WATER-CONTAINING EXPLOSIVES | 1994 |
|
RU2100773C1 |
METHOD FOR CHARGING OF FLOODED VERTICAL AND INCLINED HOLES (MODIFICATIONS) | 2001 |
|
RU2184344C1 |
METHOD FOR FORMING OF SPACE-CHARGE OF EXPLOSIVES IN PARTIALLY FLOODED HOLES | 2006 |
|
RU2310158C1 |
METHOD FOR PRODUCTION OF WATER-CONTAINING EXPLOSIVES | 2000 |
|
RU2204544C2 |
Authors
Dates
2001-06-10—Published
1999-11-23—Filed