FIELD: construction engineering, erection and repair of main pipe lines in boggy ground and water-bearing ground; shore areas of water obstacles. SUBSTANCE: saddle-shaped U-shaped box of weighting material has walls inclined relative to vertical axis; it is provided with belt and mounting hinges in upper portion of these walls. Saddle-shaped part of box is engageable with inner flat surfaces of side wells. Hinged valves are secured to outer side surfaces of lateral wells. Pipe line is laid in dug trench and weighting material is placed on them; upper edges of valves are freed and are hinged to bottom of trench. Weighting materials are fixed on pipe line by pouring soil on valves. Boxes are filled with ballast and trench is filled with soil. EFFECT: enhanced reliability. 5 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PIPELINE REPAIR | 1999 |
|
RU2180718C2 |
METHOD OF BALLASTING SUBTERRANEAN PIPE LINE | 1998 |
|
RU2153119C2 |
PIPELINE BALLASTING DEVICE | 2018 |
|
RU2680772C1 |
METHOD FOR COMPLEX CORROSION PROTECTION OF ISOLATED CONSTRUCTION | 1997 |
|
RU2151820C1 |
DEVICE FOR INCREASING DEAD LOAD OF PIPE LINE AND METHOD OF ITS BALLASTING | 1992 |
|
RU2047035C1 |
METHOD OF PIPELINE BALLASTING IN A WATER-FLOODED TRENCH | 2017 |
|
RU2664322C1 |
METHOD OF ERECTION OF PIPE LINES | 1999 |
|
RU2171939C2 |
REDUCED HEAT REMOVAL INTERNAL COMBUSTION ENGINE AND METHOD OF ITS MANUFACTURE | 1996 |
|
RU2168039C2 |
DEVICE FOR UNDERWATER PIPELINE BALLASTING | 2017 |
|
RU2664323C1 |
PIPELINE BALLASTING METHOD | 2017 |
|
RU2667308C1 |
Authors
Dates
2002-07-20—Published
2000-11-03—Filed