FIELD: boiler erection, modification of steam boilers. SUBSTANCE: boiler erection process includes installation of at least two rows of supports carrying supporting frames on foundation; installation of vertical framework supporting columns on mentioned frame at certain distance from each other; construction of supporting frame whose overall dimensions conform to those of boiler framework; supporting frame should be made of at least two longitudinal beams and several cross-beams attached to them; cross-beams and beams are overhung relative to foundation supports of extreme rows. Cross-beams can be rigidly fixed to opposing foundation supports and longitudinal beams, to cross-beams; vertical supporting columns can be mounted on mentioned longitudinal beams of supporting frame. EFFECT: enlarged overall dimensions of boiler framework without changing its elevation. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HOT WATER BOILER OF RECTANGULAR CROSS-SECTION | 2014 |
|
RU2575297C1 |
VERTICAL WATER-TUBE BOILER UNIT | 0 |
|
SU682728A1 |
CONVECTIVE SHAFT OF BOILER WITH NODE FOR SEALING OF PASSAGE OF VERTICAL PIPES | 2019 |
|
RU2702314C1 |
WATER HEATING BOILER WITH RECTANGULAR CROSS-SECTION | 2014 |
|
RU2563874C1 |
STEAM BOILER | 2018 |
|
RU2692439C1 |
HOT-WATER BOILER OF RECTANGULAR CROSS SECTION | 2017 |
|
RU2683337C1 |
HOT-WATER BOILER OF RECTANGULAR CROSS SECTION | 2017 |
|
RU2683341C1 |
STEAM BOILER | 2002 |
|
RU2296913C2 |
HOT-WATER BOILER OF RECTANGULAR CROSS SECTION | 2017 |
|
RU2683348C1 |
VERTICAL DOUBLE-DRUM BOILER | 1994 |
|
RU2096679C1 |
Authors
Dates
2004-05-20—Published
2002-04-05—Filed