FIELD: building, particularly building reliability renewal during reconstruction thereof by lifting, straightening and strengthening building structures. SUBSTANCE: method involves inspecting building; producing and mounting strengthening belts; providing depressions for jacks; installing jack system comprising flat jacks, pump stations and inner control system including slight displacement sensors; forming outer control system in the form of reflecting marks located in distinguished points of vertical elevate building sections and in base points arranged in building location area and specified by centers of beacon; arranging electronic coordinate inspection means in base points; connecting electronic coordinate inspection means to computer; linking computer to automatic control means of jack system; orienting electronic coordinate inspection means into building coordinate system; determining xo, yo and zo coordinates of reflecting marks; forming lifting program including N building lifting cycles. EFFECT: possibility of lifting processes automation; increased safety of above processes. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONTINUOUS BUILDING LIFTING AND STRAIGHTENING | 2003 |
|
RU2242564C1 |
METHOD FOR CONTINUOUS BUILDING LIFTING AND STRAIGHTENING | 2005 |
|
RU2303107C1 |
METHOD OF CONTINUOUS LIFTING AND LEVELLING OF BUILDINGS | 2010 |
|
RU2420631C1 |
SYSTEM TO LIFT AND BALANCE BUILDINGS | 2010 |
|
RU2425926C1 |
BUILDING LIFTING AND LEVELING SYSTEM | 2003 |
|
RU2224845C1 |
PROCESS OF UNINTERRUPTED LIFTING AND LEVELING OF BUILDINGS AND STRUCTURES | 2002 |
|
RU2211896C1 |
METHOD OF SYNCHRONOUS LIFTING AND LOWERING OF A PART OF A BUILDING DESIGN | 2018 |
|
RU2682414C1 |
METHOD TO LEVEL BUILDING, STRUCTURE | 2014 |
|
RU2575193C1 |
METHOD OF RAISING A BUILDING WITH THE REMOVAL OF THE VIRTUAL AXIS OF ROTATION FOR ITS SPOT | 2018 |
|
RU2683469C1 |
METHOD TO BALANCE MONOLITHIC REINFORCED CONCRETE STRUCTURES | 2010 |
|
RU2426837C1 |
Authors
Dates
2004-06-10—Published
2003-01-04—Filed