FIELD: construction.
SUBSTANCE: method to level a building, a structure includes their research, building preparation, including manufacturing and installation of wales, jack niches and installation of a jack system, comprising flat jacks and a pump station, and also an internal control system comprising resistor sensors of small movements, formation of an external control system. After the installation of wales they drill wells along bearing walls or in the area of the foundation bed, where metal injectors are driven. High-frequency vibrators are fixed to the injectors installed at the side opposite to the building, structure tilt. After lifting of the building, structure with the jack system, they moisturize the subsiding soil via the installed injectors to moisture of 0.75-0.85, close to subsiding properties manifestation by soil. Then high-frequency vibrations are sent to the moist soil, then by means of the jack system starting they correct the building position.
EFFECT: increased operational reliability of a building, reduced material intensity and labour intensiveness in levelling of a structure and its foundation, increased bearing capacity of soils in the process of lifting and levelling of buildings and structures on natural foundations with jacks.
12 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO BALANCE MONOLITHIC REINFORCED CONCRETE STRUCTURES | 2010 |
|
RU2426837C1 |
BUILDING STRAIGHTENING METHOD | 2004 |
|
RU2275474C2 |
METHOD FOR ALIGNMENT OF THE WELLHEAD BOREHOLE DRIVES FOUNDATION AND JACK UNIT FOR ITS IMPLEMENTATION | 2019 |
|
RU2710741C1 |
METHOD FOR CONTINUOUS BUILDING LIFTING AND STRAIGHTENING | 2005 |
|
RU2303107C1 |
METHOD OF SYNCHRONOUS LIFTING AND LOWERING OF A PART OF A BUILDING DESIGN | 2018 |
|
RU2682414C1 |
METHOD OF STRUCTURES ALIGNMENT | 2007 |
|
RU2341621C1 |
METHOD FOR ELEVATING AND LEVELLING BULDINGS | 2006 |
|
RU2333322C1 |
METHOD OF CONTINUOUS BUILDING LIFTING AND STRAIGHTENING | 2003 |
|
RU2242564C1 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
METHOD OF BUILDING CONTINUOUS LIFTING AND STRAIGHTENING | 2003 |
|
RU2230164C1 |
Authors
Dates
2016-02-20—Published
2014-12-29—Filed