FIELD: oil and gas industry, particularly for completing oil and gas wells.
SUBSTANCE: method involves boring well over planned drilling depth; covering productive bed with sand; arranging cement bridge of 2-4 m height over sand layer; driving casing pipe up to reaching bed roof; cementing hole annuity of casing pipe up to well head; drilling cement bridge; washing out sand; deepening shank; cementing hole annuity around shank and punching shank within the thickness of productive bed.
EFFECT: retention of collecting properties of productive bed and reduced cost.
1 ex
| Title | Year | Author | Number |
|---|---|---|---|
| WELL COMPLETION METHOD | 2004 |
|
RU2253731C1 |
| METHOD FOR CONSTRUCTION OF WELL FOR MULTIBED OIL DEPOSIT | 2003 |
|
RU2235854C1 |
| METHOD OF CONSTRUCTING WELL OF MULTILAYER OIL FIELD | 1999 |
|
RU2161239C1 |
| METHOD OF TREATING BOTTOM ZONE OF FORMATION | 2006 |
|
RU2304698C1 |
| METHOD OF WELL COMPLETION | 2002 |
|
RU2209941C1 |
| WELL COMPLETION METHOD | 2022 |
|
RU2794830C1 |
| PROCESS OF PUMPING TREATMENT MORTARS DOWN BOREHOLE | 1993 |
|
RU2057898C1 |
| WELL CONSTRUCTION METHOD | 2005 |
|
RU2295628C1 |
| COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 |
|
RU2793351C1 |
| METHOD OF HORIZONTAL WELL COMPLETION | 2000 |
|
RU2171359C1 |
Authors
Dates
2004-09-20—Published
2003-09-22—Filed