FIELD: ceramic and aviation industries; manufacture of large-sized ceramic articles of complex configuration.
SUBSTANCE: proposed method includes placing the metal frame in ceramic article, laying the gaskets in clearance between end face of ceramic article and frame and keeping them in such position till complete vulcanization of sealant; then article is subjected to drying. Gaskets are additionally laid in clearance between inner surface of article and surface of frame; thickness of gaskets corresponds to respective clearances.
EFFECT: reduction of time required for assembly of ceramic article with metal frame.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONNECTING CERAMIC PRODUCT WITH METALLIC FRAME | 2016 |
|
RU2637692C1 |
METHOD OF SELECTIVE ASSEMBLY OF FAIRINGS | 2019 |
|
RU2702552C1 |
METHOD OF CONNECTING CERAMIC FAIRING WITH FRAME | 2015 |
|
RU2587708C1 |
METHOD FOR CONNECTING A CERAMIC PRODUCT WITH A METAL FRAME | 2021 |
|
RU2779164C1 |
METHOD FOR CONNECTING THE CERAMIC FAIRING WITH THE METAL BODY OF THE AIRCRAFT | 2021 |
|
RU2764158C1 |
METHOD OF CONNECTION OF CERAMIC FAIRING WITH METAL CASING OF AIRCRAFT | 2014 |
|
RU2566643C1 |
ANTENNA FAIRING | 2001 |
|
RU2189674C1 |
FLYING-VEHICLE NOSE FAIRING | 2005 |
|
RU2280301C1 |
METHOD FOR OBTAINING ADHESIVE BONDING OF PARTS | 2021 |
|
RU2751979C1 |
ANTENNA FAIRING | 2001 |
|
RU2189673C1 |
Authors
Dates
2005-07-27—Published
2003-11-24—Filed