FIELD: assembly of track skeletons.
SUBSTANCE: proposed skeleton assembly line has lift arranged under pack of ties for lifting and lowering of ties, two cutoffs arranged at opposite sides relative to tie pack, cutoff displacement drives to separate lower row of ties from tie pack, cylinders to align ties of one row on lift. Line is furnished also with adjusting device to adjust position of ties in cross and longitudinal directions, lifting rollers table for shifting ties from conveyor onto indexing conveyor, chain conveyor, speed control system of indexing conveyor and chain conveyor and stationary rail placer.
EFFECT: increased degree of automation, provision of high capacity, reduced labor input and cost of products at high quality and improved conditions of labor.
34 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
AUTOMATED COMPLEX FOR ASSEMBLING RAIL-SLEEPER GRID OF RAILWAY TRACK | 2021 |
|
RU2761484C1 |
FLOW LINE FOR ASSEMBLY OF RAIL-AND-SLEEPER GRID LINKS IN RAILWAY TRACK | 2008 |
|
RU2373320C1 |
FLOW LINE FOR ASSEMBLING TRACK SKELETON MEMBERS | 2003 |
|
RU2268333C2 |
WOODEN TIE SORTING AND PACKAGING DEVICE | 1997 |
|
RU2130420C1 |
SLEEPER FEEDER OF LINK-ASSEMBLING LINE | 2009 |
|
RU2410483C1 |
METHOD OF CONSTRUCTION AND REPAIR OF CONTINUOUS WELDED RAIL, TRACK PANEL AND TRACK LAYING SYSTEM FOR ITS REALISATION | 2014 |
|
RU2572485C1 |
AUTOMATED TRANSPORT AND STORAGE SYSTEM FOR AUTOMOBILE TIRES | 1990 |
|
RU2013327C1 |
BULK GEOGRID LAYING MACHINE | 2012 |
|
RU2521171C2 |
MACHINE TO LAY GEOSYNTHETIC MATERIALS INTO UNDERBALLAST LAYER OF RAILWAY GROUND WORK WITHOUT REMOVAL OF RAIL AND SLEEPER GRID | 2010 |
|
RU2477349C2 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
Authors
Dates
2006-10-10—Published
2005-03-22—Filed