FIELD: storing or distributing natural gas.
SUBSTANCE: underground storage is separated from the metro working by means of a soil massive and is connected with two heat insulated cryogenic liquid and gas pipelines. Inside the working, the liquid pipeline is connected with a high-pressure gasifier whose outlet is connected with the stop valve through the gas pipeline and to the gasifier through the second stop-control valve. The outlet of the gasifier is connected with the gas engine of the reserve power plant through a receiver.
EFFECT: expanded functional capabilities.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF USING RESERVE UNDERGROUND STORAGE FOR LIQUEFIED NATURAL GAS | 2005 |
|
RU2298725C1 |
DUAL LOOP DEEP NUCLEAR POWER SYSTEM | 2023 |
|
RU2813198C1 |
METHOD FOR FILLING OF RESERVE STORAGE FACILITIES WITH LIQUEFIED NATURAL GAS | 2012 |
|
RU2488758C1 |
UNDERGROUND LIQUEFIED NATURAL GAS STORAGE TANK | 2003 |
|
RU2232342C1 |
UNDERGROUND STORAGE OF LIQUEFIED NATURAL GAS | 2014 |
|
RU2566325C1 |
METHOD OF EVAPORATION AND USE OF LIQUEFIED NATURAL GAS FOR SYSTEMS OF AUTONOMOUS POWER SUPPLY IN ARCTIC ZONE | 2014 |
|
RU2570952C1 |
UNDERGROUND STORAGE OF LIQUIFIED NATURAL GAS (LNG UGS) | 2009 |
|
RU2418728C2 |
STORAGE OF LIQUEFIED NATURAL GAS | 2010 |
|
RU2431771C1 |
LIQUEFIED NATURAL GAS UNDERGROUND STORAGE (LNG US) | 2014 |
|
RU2566180C1 |
UNDERGROUND STORAGE OF LIQUEFIED NATURAL GAS | 2010 |
|
RU2431770C1 |
Authors
Dates
2007-05-10—Published
2005-12-26—Filed