FIELD: railroad track facilities mechanization, particularly to assemble railroad lengths at manufacturing facilities of machine stations.
SUBSTANCE: production line comprises parallel direct and reverse rows of satellite tracks sliding along guiding means and not connected with each other. The tracks constitute launders. Each satellite track has length corresponding to railroad length to be assembled. Production line also has transmission units with satellite track movement mechanisms, which provide longitudinal satellite track displacement and are arranged at row ends to connect the ends with each other. Railroad length assemblage equipment is installed along the rows. Movement mechanism, which provides continuous slow launder sliding, is mounted at each row. Rail-laying device, which layers rails on sleeper set of railroad length to be assembled, is mounted over transmission unit adapted to close direct row end with reverse row start.
EFFECT: increased operational efficiency and decreased length thereof.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
PRODUCTION ASSEMBLY LINE OF LINKS OF TRACK SKELETON OF RAILROAD | 2010 |
|
RU2436886C1 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
PRODUCTION LINE FOR REPAIR OF LINKS OF THE TRACK AND SLEEPER GRID OF THE RAILWAY | 2010 |
|
RU2441960C1 |
FLOW LINE FOR ASSEMBLY OF RAIL-AND-SLEEPER GRID LINKS IN RAILWAY TRACK | 2008 |
|
RU2373320C1 |
FLOW LINE FOR ASSEMBLING RAILWAY TRACK SECTIONS | 2004 |
|
RU2260089C1 |
MOBILE STORAGE OF RAILS OF LINK-ASSEMBLING LINE | 2011 |
|
RU2497999C2 |
FLOW LINE FOR ASSEMBLING SECTIONS OF TRACK SKELETONS | 2005 |
|
RU2298608C1 |
FLOW-LINE FOR ASSEMBLING SECTIONS OF RAIL-AND-SLEEPER UNITS | 1997 |
|
RU2115782C1 |
RAIL LENGTH ASSEMBLY LINE | 2008 |
|
RU2377357C1 |
Authors
Dates
2007-08-10—Published
2005-10-26—Filed