FIELD: railway transport; permanent way.
SUBSTANCE: invention relates to mechanization of track facilities and it can be used for assembling sections of track skeletons at production bases of track machine station. Proposed flow line for assembling sections of track skeletons has straight and return flows of carts-pallets arranged on non-intercoupled guides, length of each cart-pallet being equal to length of section of track skeleton. Transfer sets are arranged at ends of flows interclosing the flows. Mechanisms to provide longitudinal travel of carts-pallets and processing equipment are arranged along flows. Each cart-pallet is furnished with hinge posts with cradles to arranged rails of skeleton to be assembled. Processing equipment includes device for mounting intermediate rail fastenings type КБ and type ЖБР with rails arranged over ties.
EFFECT: provision of effective assembling of track skeletons.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION ASSEMBLY LINE OF LINKS OF TRACK SKELETON OF RAILROAD | 2010 |
|
RU2436886C1 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
PRODUCTION LINE FOR REPAIR OF LINKS OF THE TRACK AND SLEEPER GRID OF THE RAILWAY | 2010 |
|
RU2441960C1 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2005 |
|
RU2304190C1 |
FLOW LINE FOR ASSEMBLY OF RAIL-AND-SLEEPER GRID LINKS IN RAILWAY TRACK | 2008 |
|
RU2373320C1 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
MOBILE STORAGE OF RAILS OF LINK-ASSEMBLING LINE | 2011 |
|
RU2497999C2 |
DEVICE FOR LAYING RAILS ON TIE BASEPLATES, MAINLY FOR SECTION ASSEMBLING LINES | 2006 |
|
RU2307886C1 |
FLOW LINE FOR ASSEMBLING RAILWAY TRACK SECTIONS | 2004 |
|
RU2260089C1 |
RAIL LENGTH ASSEMBLY LINE | 2008 |
|
RU2377357C1 |
Authors
Dates
2007-05-10—Published
2005-11-21—Filed