FIELD: construction.
SUBSTANCE: mobile storage of rails of a link-assembling line comprises a splice moved along guides and arranged on them, at least from two transport trolleys for rails, every of which includes joined carriages that move in guides. Carriages of one of transport trolleys for rails are connected to each other by stiff strainers. Carriages of the other transport trolley for rails between each other are fixed by flexible strainers and equipped with fixators of at least two rails laid onto the transport trolley. One of the carriages of each transport trolley for rails is equipped with a thrust shield for rail ends.
EFFECT: provision of rails for shift efficiency under minimum dimensions of its arrangement in the zone of a device of rail laying onto a set of sleepers of an assembled link under favourable conditions of its operation.
7 dwg
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2005 |
|
RU2304190C1 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
PRODUCTION LINE FOR REPAIR OF LINKS OF THE TRACK AND SLEEPER GRID OF THE RAILWAY | 2010 |
|
RU2441960C1 |
FLOW LINE FOR ASSEMBLING TRACK SKELETON MEMBERS | 2003 |
|
RU2268333C2 |
PRODUCTION ASSEMBLY LINE OF LINKS OF TRACK SKELETON OF RAILROAD | 2010 |
|
RU2436886C1 |
METHOD TO ASSEMBLE RAIL LENGTHS IN UNPADDED TYPE OF JOINTS | 2010 |
|
RU2437979C1 |
DEVICE FOR RAILS HANDLING AT RAIL LENGTH ASSEMBLY-DISASSEMBLY LINES | 2010 |
|
RU2451777C1 |
FLOW LINE TO ASSEMBLE RAIL LENGTHS | 2009 |
|
RU2410484C2 |
FLOW LINE FOR ASSEMBLY OF RAIL-AND-SLEEPER GRID LINKS IN RAILWAY TRACK | 2008 |
|
RU2373320C1 |
DEVICE TO LAY RAILS ON LINK-ASSEMBLING LINE | 2011 |
|
RU2497997C2 |
Authors
Dates
2013-11-10—Published
2011-10-13—Filed