FIELD: railway transport; track machine stations.
SUBSTANCE: invention relates to mechanization of assembly of rail track sections. Proposed device for laying rails on tie baseplates contains jacks not less than four from each side arranged along rail section at assembling lines. Said jacks carry cantilever rail holders. Each rail holder is made in form of tilted platform for rail foot with limiting ribs mounted on cantilever beam installed on jack for horizontal displacement by power mechanism. Platform has angle to keep rail foot at touching of one rib of baseplate higher than flange of baseplate arranged under other rib of rail. Invention is aimed at creating device operating with rail fastenings of different types others with provision of orientation of each rail relative to underrail platform of tie at preservation of straight-line position of rail at subsequent lowering of rail on ties found on strings of cars-pallets, reduced time of assembling owing to combined operations of rail laying and car-pallet string assembling, reduction of length of line by length of rail owing to transverse feeding at assembly section.
EFFECT: enlarged operating capabilities.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR MOUNTING RAILS ON SLEEPERS | 2008 |
|
RU2407846C2 |
FLOW LINE TO ASSEMBLE RAIL LENGTHS | 2009 |
|
RU2410484C2 |
METHOD TO ASSEMBLE RAIL LENGTHS IN UNPADDED TYPE OF JOINTS | 2010 |
|
RU2437979C1 |
FLOW LINE FOR ASSEMBLING SECTIONS OF TRACK SKELETONS | 2005 |
|
RU2298608C1 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2006 |
|
RU2304191C1 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
PRODUCTION LINE FOR REPAIR OF LINKS OF THE TRACK AND SLEEPER GRID OF THE RAILWAY | 2010 |
|
RU2441960C1 |
RAIL LENGTH ASSEMBLY LINE | 2008 |
|
RU2377357C1 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2005 |
|
RU2304190C1 |
FLOW LINE FOR ASSEMBLING RAILWAY TRACK SECTIONS | 2004 |
|
RU2260089C1 |
Authors
Dates
2007-10-10—Published
2006-05-17—Filed