FIELD: construction.
SUBSTANCE: method includes delivery of sleeper packs with their approximate arrangement, setting sleepers according to epure, laying rails onto sleepers, installation of joint elements and their assembly. Installation of fixture elements and their assembly is carried out until the sleepers are laid onto sleepers. The spring terminals of the fixtures are previously fixed in the assembly position, afterwards the rails are laid. The foot of each rail is arranged between ledges of stop brackets of joints. Then the fixing elements of joints are loosened, spring terminals are set from assembly position into working one, and fixing elements of joints are screwed with the required torque.
EFFECT: provision of aligned installation of rails onto sleepers.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
FLOW LINE TO ASSEMBLE RAIL LENGTHS | 2009 |
|
RU2410484C2 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
AUTOMATED COMPLEX FOR ASSEMBLING RAIL-SLEEPER GRID OF RAILWAY TRACK | 2021 |
|
RU2761484C1 |
PRODUCTION LINE FOR REPAIR OF LINKS OF THE TRACK AND SLEEPER GRID OF THE RAILWAY | 2010 |
|
RU2441960C1 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2006 |
|
RU2304191C1 |
FLOW LINE FOR ASSEMBLING SECTIONS OF TRACK SKELETONS | 2005 |
|
RU2298608C1 |
SCREWING DEVICE FOR RAIL CONNECTION OF ZHBR-65SH | 2008 |
|
RU2376412C1 |
MOVING DEVICE FOR ATTACHING LONG JOINTS BY MEANS OF ZHBR-TYPE FASTENINGS DURING REPLACEMENT OF INVENTORY RAILS | 2008 |
|
RU2385376C1 |
INTERMEDIATE RAIL FASTENER ON REINFORCED CONCRETE BASE | 2002 |
|
RU2205258C1 |
METHOD FOR REPLACING CLAMPED BUFFER RAILS AND RAILS OF TEMPORARY RECONSTRUCTION OF CONTINUOUS WELDED RAIL TRACK LENGTH (VERSIONS) | 2016 |
|
RU2643324C1 |
Authors
Dates
2011-12-27—Published
2010-05-07—Filed