FIELD: construction, particularly bored piles with enlarged footing or enlargements at the bottom of the pile.
SUBSTANCE: method involves drilling well; filling the well with concrete mix and non-detonating composition including fuel and oxidizer; igniting non-detonating composition by applying low-voltage pulse to electric igniter and combusting non-detonating composition in deflagration regime to create camouflet void with following concrete mix hardening. The fuel is solid hydrocarbon selected from polyethylene, polypropylene and polystyrene. The oxidizer is sodium or potassium chlorate. Non-detonating composition is supplied in well before well filling with concrete mix.
EFFECT: decreased pile production time due to accelerated concrete mix hardening and improved produced pile quality.
6 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD TO MANUFACTURE BORED PILE AND DEVICE FOR ITS REALISATION | 2012 |
|
RU2526451C2 |
METHOD TO MANUFACTURE BORED PILES AND DEVICE FOR ITS REALISATION | 2012 |
|
RU2525896C2 |
METHOD OF BORED PILE PRODUCTION AND DEVICE FOR ITS REALISATION | 2014 |
|
RU2570695C1 |
BORED PILES MANUFACTURING METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2713824C1 |
METHOD OF ERECTION RAMMING DESIGN IN SOIL | 2015 |
|
RU2605213C1 |
CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |
|
RU2221918C2 |
METHOD FOR CREATING BROADENING AT THE END OF PILE | 2016 |
|
RU2651655C2 |
PERFORATION AND TREATMENT METHOD OF BOTTOM-HOLE ZONE, AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2469180C2 |
BLAST-HOLE PRESSURE GAS GENERATOR, CARTRIDGE FOR MANUFACTURING BLAST-HOLE PRESSURE GAS GENERATOR (VERSIONS), DEVICE FOR FILLING CARTRIDGE WITH FUEL, METHOD FOR MANUFACTURING BLAST HOLE PRESSURE GAS GENERATOR IMMEDIATELY BEFORE USE AND METHOD FOR LOADING GAS GENERATOR INTO BLAST HOLE (VERSIONS) | 2016 |
|
RU2633606C1 |
METHOD FOR INCREASING LOAD-BEARING CAPACITY OF CAST-IN-PLACE PILE | 2003 |
|
RU2241098C1 |
Authors
Dates
2008-04-20—Published
2006-11-15—Filed