FIELD: metallurgy.
SUBSTANCE: intermediate device contains tank with bottom consisting of section of metal melt and slag being. Specified tank sections are connected to each other in the bottom part of tank by means of channel with temporary overlap. Presence of temporary overlap is defined by time of metal melt and slag being in appropriate section. Input of channel for metal discharge and side channel for slag discharge are located at height h1 and h2, at that h1<h2.
EFFECT: receiving of ultrapure steel at the expense of minimisation ingress of furnace slag with metal into ladle.
3 cl, 7 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SEPARATION OF THE CLINKER AT DECANTATION OF THE MOLTEN METAL FROM THE CONVERTER THROUGH THE OUTLET INTO THE LADLE AND THE DEVICE FOR THE METHOD REALIZATION | 2005 |
|
RU2294380C2 |
METAL MELTING VESSEL EMPTYING METHOD FOR DISCHARGING MAIN PART OF MELT METAL THROUGH OUTLET OPENING IN BOTTOM SURFACE OF VESSEL AND METAL MELTING VESSEL | 2005 |
|
RU2293937C2 |
FURNACE FOR PRODUCTION OF MELTED METAL | 2006 |
|
RU2331031C2 |
METHOD FOR REMOVING SLAG FROM METAL SURFACE IN STEEL CASTING BUCKET | 2020 |
|
RU2744233C1 |
APPARATUS FOR PREVENTING CRATER FORMATION | 2003 |
|
RU2245217C1 |
METHOD OF AFFECTING CHEMICAL COMPOSITION OF LIQUID METAL | 2005 |
|
RU2299912C2 |
METHOD FOR ACTING UPON CHEMICAL COMPOSITION OF MELT STEEL BEFORE CONTINUOUS CASTING PROCESS AND DURING SUCH PROCESS AND CRATER FORMATION PREVENTING APPARATUS FOR PERFORMING THE METHOD | 2003 |
|
RU2247625C1 |
METHOD OF ACTING ON CHEMICAL COMPOSITION OF MOLTEN STEEL AND EQUIPMENT COMPLEX FOR REALIZATION OF THIS METHOD | 2005 |
|
RU2288280C1 |
METHOD FOR CASTING METAL AND APPARATUS FOR PERFORMING THE SAME | 2002 |
|
RU2250809C2 |
INTERMEDIATE STEEL CASTING LADLE | 2003 |
|
RU2262414C2 |
Authors
Dates
2008-11-27—Published
2006-05-29—Filed