FIELD: metallurgy.
SUBSTANCE: facility of hard material feeding includes two or more pairs of lance for insufflation of hard materials of charge for the process of direct fusion into melting assembly. Facility of hard materials feeding includes also feeding mainstream and couple of dropout line for feeding of hard materials of charge to lance from each pair of lance, at that dropout lines connect to each other feeding mainstream and lance of couple of lances. Lances are located around of assembly in pairs of diametrical lances. At least, one pair of lances is provided for insufflation of metal-bearing raw materials, such as iron-containing materials, especially iron-ore articles, and, at least one of other lances pair is provided for insufflation hard carbonaceous material, such as coal, and additionally fluxes. Lances pairs are located around of assembly so that neighbouring lances are lances, provided for lances of different materials.
EFFECT: effective and reliable feeding of hard materials into facility of direct fusion.
18 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
FACILITY FOR DIRECT MELT | 2004 |
|
RU2343200C2 |
METHOD OF DIRECT MELTING | 1999 |
|
RU2221050C2 |
METHOD AND ASSEMBLY FOR PROCESSING IRON-CONTAINING MATERIAL | 1995 |
|
RU2093585C1 |
METHOD FOR MAKING STEEL OF IRON-CONTAINING RAW MATERIAL AND AGGREGATE FOR PERFORMING THE SAME | 1999 |
|
RU2167205C1 |
SOLID CHARGE LOADING DURING DIRECT MELTING | 2005 |
|
RU2418862C2 |
METHOD OF DIRECT PRODUCTION OF IRON-CARBON ALLOYS AND DEVICE FOR ITS IMPLEMENTATION | 2007 |
|
RU2361926C1 |
PRODUCTION OF IRON | 2006 |
|
RU2422537C2 |
INSTALLATION FOR DIRECT MELTING | 2007 |
|
RU2431681C2 |
METHOD FOR DIRECT PRODUCTION OF METALS FROM MATERIALS CONTAINING IRON OXIDES (VERSIONS) AND DEVICE FOR IMPLEMENTING IT | 2012 |
|
RU2548871C2 |
METHOD OF MANUFACTURING OF MOLTEN CAST IRON | 2008 |
|
RU2453608C2 |
Authors
Dates
2009-01-10—Published
2004-04-08—Filed