FIELD: transport.
SUBSTANCE: tamping members containing independent drives of movement along railway line are moved to the working area. Tamping members are located on the machine having the drive of movement along rails. Tamping picks are buried in ballast. The line is straightened and tamped. Tamping members are lifted after being moved with longitudinal movement drives and buried in the ballast. Drive of the device is activated. Tamping blocks are approached by using the machine, and the machine is stopped at the track alignment and ballast consolidation members in operation.
EFFECT: increasing efficiency of sleeper tamping machine.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RAIL TRACK TAMPING AND STABILISING AND TIE-TAMPER TO THIS END | 2007 |
|
RU2378444C2 |
REINFORCED CONCRETE SLEEPER | 2013 |
|
RU2536433C2 |
METHOD FOR TAMPING OF RAILWAY SLEEPERS | 2008 |
|
RU2372440C1 |
SYSTEM FOR CONTROL OF A GROUP OF TAMPING MACHINES | 2018 |
|
RU2704764C1 |
METHOD FOR RAILWAY TRACK SLEEPER TAMPING AND MACHINE FOR ITS REALISATION | 2011 |
|
RU2468136C1 |
OUTHANG OF SLEEPER | 2017 |
|
RU2646703C1 |
TRACK MAINTAINER | 2000 |
|
RU2193616C2 |
TAMPING METHOD OF RAILWAY TRACK CROSS-TIES | 2013 |
|
RU2534163C1 |
TIE TAMPING MACHINE | 2000 |
|
RU2194108C2 |
METHOD FOR CORRECTION OF RAIL TRACK POSITION | 2013 |
|
RU2547108C1 |
Authors
Dates
2010-04-10—Published
2007-03-15—Filed