FIELD: oil and gas production.
SUBSTANCE: procedure consists in implementation of hydro-jack block mounted of wellhead after disassembly of production tree to main gate, whereupon main gate is removed from tubing string head by means of hydro-jack bock. Further, the hydro-jack block is connected to flow string; the flow string is stretched; a control head is connected to the flow string; the control head and the suspended flow string are installed in the production well; and the tubing string head is dismantled.
EFFECT: reduced labour intensiveness and increased efficiency, also reduced idle time of well and elimination of unfavourable results of operation related to production horizon, absence of leaks of well medium to atmosphere.
7 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRAULIC JACK BLOCK FOR CARRYING OUT REPAIR AND RESTORATION WORK TO REPLACE WELLHEAD EQUIPMENT | 2022 |
|
RU2780181C1 |
DEVICE FOR CHANGING FAULTY ELEMENTS OF MAIN VALVES ON THE SIDE BRANCHES OF PIPE HEADS WITH SUBSEQUENT SEALING | 2023 |
|
RU2807425C1 |
METHOD FOR HYDRAULIC RESERVOIR FRACTURING INSIDE GAS WELL | 2005 |
|
RU2306412C1 |
METHOD OF TRANSFER OF GAS AND GAS CONDENSATE WELLS, INCLUDING FLOODED ONES, FOR OPERATION ALONG TWO LIFTING COLUMNS, METHOD OF SUCH WELLS OPERATION AND DEVICE FOR IMPLEMENTATION OF SUCH METHODS | 2019 |
|
RU2739273C2 |
DEVICE FOR SIMULTANEOUS REPLACEMENT OF MASTER GATES UNDER PRESSURE | 2009 |
|
RU2399748C1 |
UNIVERSAL WELLHEAD PACKER | 2013 |
|
RU2534690C1 |
WELL CONVERSION METHOD, INCLUDING FLOODED WELLS, FOR OPERATION WITH TWO PRODUCTION STRINGS AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2523270C1 |
PROCEDURE FOR WELLHEAD RE-MANIFOLDING | 2010 |
|
RU2434117C1 |
RE-EQUIPMENT OF SELF-SQUEEZING GAS WELL HEAD | 2013 |
|
RU2524787C1 |
METHOD FOR SIMULTANEOUS DISPLACEMENT OF HEAD VALVES OF PRODUCTION TREE UNDER PRESSURE | 2009 |
|
RU2405910C1 |
Authors
Dates
2010-07-10—Published
2009-03-02—Filed