FIELD: construction.
SUBSTANCE: method for dismantling of brick vaults consists in arrangement of unloading stands, within trestle work. Process of dismantling is started from the centre, and braces are installed in place of dismantled sections in process of works.
EFFECT: lower pernicious effect of structure dismantling against bearing system of a building, lower injury rate in process of dismantling.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TIMBER FLOOR STRUCTURE RECONSTRUCTION | 2006 |
|
RU2308587C1 |
METHOD OF STRENGTHENING STONE VAULTED FLOORINGS OF BUILDING | 2016 |
|
RU2640612C2 |
METHOD TO REINFORCE STONE FLOOR VAULTS OF BUILDING | 2011 |
|
RU2471943C2 |
PROCESS OF STRIPPING OF EXTERIOR PANELS | 2000 |
|
RU2188918C2 |
METHOD OF RECONSTRUCTION OF BUILDINGS AND STRUCTURES | 2023 |
|
RU2820548C1 |
METHOD OF BUILDING RECONSTRUCTION | 1995 |
|
RU2078885C1 |
METHOD FOR ENSURING SURVIVABILITY OF DAMAGED BUILDING OR STRUCTURE AND SAFE CONDUCT OF THE REPAIR WORKS | 2010 |
|
RU2441967C1 |
METHOD FOR BUILDING RECONSTRUCTION AND SUPERSTRUCTING | 1993 |
|
RU2046908C1 |
CONTROL METHOD OF ENLARGEMENT OF SURVIVABILITY OF MULTI-STORIED BEARING-WALL BUILDING AFTER EXPLOSION ACTION AND SAFE PERFORMANCE OF REPAIR AND RESTORATION WORK | 2014 |
|
RU2547849C1 |
METHOD OF BUILDING RAISING | 2013 |
|
RU2533391C1 |
Authors
Dates
2010-12-20—Published
2009-06-22—Filed