FIELD: power industry.
SUBSTANCE: cell of bitumen storage is opened, process protective shelter and control module is installed above the cell, process equipment is mounted, bitumen compound is brought into the condition suitable for its removal, bitumen compound is removed from the cell and loaded to certified package; at that, low-temperature cooling unit is mounted as the part of process equipment, bitumen compound is cooled to temperature of below minus 15°C and crushed into small fractions.
EFFECT: possible removal of bitumen compound from bitumen storage places of nuclear power stations without using any pump and heating equipment.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECOVERING RADIOACTIVE BITUMINOUS COMPOUND FROM STORAGES | 2015 |
|
RU2647869C2 |
METHOD FOR REMOVING RADIOACTIVE BITUMINOUS COMPOUND FROM BITUMEN STORAGE HOUSE | 2008 |
|
RU2400849C2 |
METHOD OF PREPARING BITUMEN FOR PREPARING ASPHALT-CONCRETE MIXTURES | 2015 |
|
RU2598952C1 |
METHOD OF PROCESSING BITUMINOUS-SALT RADIOACTIVE COMPOUNDS | 2017 |
|
RU2671243C1 |
CONCENTRATION AND UTILISATION METHOD AND SYSTEM OF INERT RADIOACTIVE GASES FROM GAS-AEROSOL EMISSIONS OF POWER UNITS OF NUCLEAR POWER PLANTS | 2011 |
|
RU2481658C2 |
TECHNICAL DEVICE FOR DISPERSING AND COMPOUNDING OF WASTE RADIOACTIVE ION EXCHANGE RESINS | 2017 |
|
RU2658669C1 |
METHOD FOR RECOVERING HETEROGENEOUS RADIOACTIVE WASTES | 2002 |
|
RU2218620C2 |
COAL SORBENT RECOVERY METHOD | 2002 |
|
RU2214012C1 |
METHOD FOR STORAGE AND BURIAL OF RADIOACTIVE WASTES (ALTERNATIVES) | 2002 |
|
RU2222840C1 |
NUCLEAR POWER PLANT | 2019 |
|
RU2720212C1 |
Authors
Dates
2010-12-20—Published
2009-11-05—Filed