FIELD: construction.
SUBSTANCE: invention relates to mining and construction equipment, is used to lay pipes in soil with open end with their simultaneous cleaning from soil. Method includes tunnelling of pilot hole, formation of working well with pulling of pipeline in it with the help of pneumatic impact device by means of soil development and movement into pipeline cavity. Soil plug is also formed with the help of previously created obstacle, afterwards it is removed, using spent compressed air from pneumatic impact device.
EFFECT: increased efficiency of works and reduced energy intensity of the process.
5 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO REPLACE PIPES IN PIPELINES | 2010 |
|
RU2484352C2 |
METHOD AND DEVICE FOR TRENCHLESS LAYING OF PIPELINE MADE OF NON-METAL MATERIALS | 1997 |
|
RU2142536C1 |
REPLACEMENT OF DEFECTIVE PIPE LINE PARTIALLY OR FULLY FILLED WITH SOIL WITHOUT DIGGING-OUT TRENCH | 1996 |
|
RU2116546C1 |
DEVICE FOR HOLE REAMING IN TRENCHLESS LAYING OF PIPELINE | 1999 |
|
RU2163956C1 |
METHOD FOR TRENCHLESS LAYING PIPELINES | 1991 |
|
RU2047697C1 |
METHOD FOR TRENCHLESS LAYING OF PIPELINE IN GROUND AND DEVICE FOR ITS REALIZATION | 1996 |
|
RU2116405C1 |
METHOD OF TRENCHLESS PIPELINE LAYING | 2002 |
|
RU2231600C1 |
METHOD AND DEVICE FOR TRENCHLESS REPLACEMENT OF SUBSURFACE PIPELINES | 1997 |
|
RU2141554C1 |
DEVICE FOR TRENCHLESS PIPE DRIVING BY PUNCTURE METHOD | 2009 |
|
RU2394128C1 |
DEVICE FOR TRENCHLESS REPLACEMENT OF PIPELINES | 2001 |
|
RU2221182C2 |
Authors
Dates
2011-01-27—Published
2009-10-26—Filed