FIELD: construction.
SUBSTANCE: method to restore an underballast layer of a railway track includes removal of old crushed stone to clean earth bed, filling a protective underballast layer onto the cleaned earth bed and its compaction, filling new crushed stone. The protective underballast layer is compacted by a track machine in two stages. At the first stage compaction is executed with application of assembled rails and sleepers with epure of sleepers making 1840 pcs/km. At the second stage compaction is executed with application of assembled rails and sleepers with epure of sleepers making 2000-2100 pcs/km. Between the first and second stages of compaction the protective underballast layer is moistened to obtain moisture of not more than 6%. Compaction is carried out at the speed of the track machine of 0.8-0.9 km/hr. At least one additional compaction of the protective ballast layer is carried out at each stage.
EFFECT: increased extent of the protective underballast layer compaction.
4 cl, 5 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD TO REPAIR UNDERBALLAST LAYER OF RAILWAY TRACK | 2010 | 
 | RU2422579C1 | 
| BULK GEOGRID LAYING MACHINE | 2012 | 
 | RU2521171C2 | 
| METHOD TO REINFORCE RAILWAY TRACK | 2010 | 
 | RU2448212C2 | 
| MACHINE TO LAY GEOSYNTHETIC MATERIALS INTO UNDERBALLAST LAYER OF RAILWAY GROUND WORK WITHOUT REMOVAL OF RAIL AND SLEEPER GRID | 2010 | 
 | RU2477349C2 | 
| METHOD FOR STRENGTHENING THE MAIN PLATFORM OF THE RAILWAY ROADBED | 2021 | 
 | RU2766844C1 | 
| DEVICE FOR RECOVERING BALLAST LAYER BASE OF RAILWAY TRACK | 1995 | 
 | RU2106451C1 | 
| METHOD OF VOLUMETRIC COMPACTION OF TRACK BALLAST SECTION | 2009 | 
 | RU2400589C1 | 
| METHOD TO REINFORCE RAILWAY TRACK | 2013 | 
 | RU2535378C1 | 
| RAILWAY TRACK IN AREA ADJACENT TO MANMADE STRUCTURE | 2010 | 
 | RU2453644C1 | 
| METHOD FOR FORMING A SUB-BALLAST PROTECTIVE LAYER AND A SET OF TRACK MACHINES FOR ITS IMPLEMENTATION | 2022 | 
 | RU2776165C2 | 
Authors
Dates
2011-06-27—Published
2010-02-25—Filed