FIELD: construction.
SUBSTANCE: method to repair an underballast layer of a railway track includes removal of old crushed stone to clean earth bed, filling a protective underballast layer onto the cleaned earth bed and its compaction, filling new crushed stone. The protective underballast layer is compacted by a track machine in two stages. At the first stage compaction is executed with application of assembled rails and sleepers with rail length of 25 m in each link. At the second stage the compaction is carried out with application of assembled rails and sleepers, having the rail length in a single link at least by 150-200 mm less than in the ones used at the first stage. At the first stage the compaction is carried out with application of used rails. At the first stage the compaction is carried out with application of used rails or new rails laid instead of used ones.
EFFECT: increased extent of the protective underballast layer compaction.
3 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO RESTORE UNDERBALLAST LAYER OF RAILWAY TRACK | 2010 |
|
RU2422578C1 |
BULK GEOGRID LAYING MACHINE | 2012 |
|
RU2521171C2 |
MACHINE TO LAY GEOSYNTHETIC MATERIALS INTO UNDERBALLAST LAYER OF RAILWAY GROUND WORK WITHOUT REMOVAL OF RAIL AND SLEEPER GRID | 2010 |
|
RU2477349C2 |
METHOD TO REINFORCE RAILWAY TRACK | 2010 |
|
RU2448212C2 |
DEVICE FOR RECOVERING BALLAST LAYER BASE OF RAILWAY TRACK | 1995 |
|
RU2106451C1 |
METHOD FOR STRENGTHENING THE MAIN PLATFORM OF THE RAILWAY ROADBED | 2021 |
|
RU2766844C1 |
METHOD TO REINFORCE RAILWAY TRACK | 2013 |
|
RU2535378C1 |
TRACK CONSTRUCTION COMPLEX | 2013 |
|
RU2532311C1 |
RAILWAY TRACK IN AREA ADJACENT TO MANMADE STRUCTURE | 2010 |
|
RU2453644C1 |
LINE FOR REPAIR OF RAILWAY TRACK LENGTHS WITH REINFORCED CONCRETE TIES | 2007 |
|
RU2361032C1 |
Authors
Dates
2011-06-27—Published
2010-02-25—Filed