FIELD: construction.
SUBSTANCE: method includes realisation of a power impact directly at icicles, at the same time icicles are formed separately from each other on rigid reinforcement rods that freely hand down along the roof edge and are the guides for water leaking from the roof during snow and ice melting. Power impact is carried out at the body of each icicle inside it by development of a smooth and/or jump-like contactless bend of reinforcement rods under action of changes in ambient temperature, accordingly, in the entire range of temperatures.
EFFECT: invention provides for the possibility to automate the process of icicles removal.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR BREAKING ICICLES | 2010 |
|
RU2444593C1 |
DEVICE FOR ICICLE DESTRUCTION | 2010 |
|
RU2442863C1 |
METHOD OF REMOVING ICICLES ALONG BUILDING ROOF PERIMETER | 2017 |
|
RU2670803C9 |
DEVICE TO REMOVE ICICLES FROM BUILDING ROOF | 2010 |
|
RU2470125C2 |
BUILDING ROOF CORNICE | 2011 |
|
RU2468162C1 |
ANTI-ICING DEVICE | 2010 |
|
RU2464395C2 |
CANTILEVER EAVE OF ROOF | 2011 |
|
RU2475606C1 |
DEVICE TO REMOVE ICICLES FROM BUILDING ROOF CORNICE | 2011 |
|
RU2481444C1 |
METHOD TO REMOVE ICICLES ALONG BUILDING ROOF PERIMETRE | 2010 |
|
RU2444594C1 |
BUILDING ROOF CORNICE | 2011 |
|
RU2475609C1 |
Authors
Dates
2012-02-27—Published
2010-07-30—Filed