FIELD: machine building.
SUBSTANCE: process rings on which sleeve fitting is mounted are installed on both sides of defective pipeline section. Process rings or composite bandage is installed on the side of edges of sleeve fitting. Sealing composition is pressed into cavities between process rings and bandage, thus creating additional seals. Hydraulic tightness tests of sleeve fitting are conducted; after that, space under sleeve fitting is filled with self-hardening mass under pressure compared to that in pipeline. For repair of extended sections there used is step installation of sleeve fittings; at that, common bandage is used for connection of neighbouring sleeve fittings.
EFFECT: improvement of repair quality due to possibility of creating self-hardening mass in space under sleeve fitting under the required pressure without sleeve-to-pipeline welding.
12 cl, 14 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RISING CATEGORY OF STRETCHED LINEAR SECTION OF OPERATING PIPELINE (VERSIONS) | 2007 |
|
RU2373452C2 |
METHOD OF PIPELINE STRENGTHENING USING SOLDERED-WELDED COUPLING | 2014 |
|
RU2563945C1 |
REPAIR METHOD OF LONG-DISTANCE LINEAR SECTION OF ACTIVE PIPELINE | 2007 |
|
RU2352855C1 |
REPAIR METHOD OF DEFECTIVE PRESSURISED PIPELINE SECTION | 2007 |
|
RU2352854C2 |
REPAIR METHOD OF LONG-DISTANCE SECTIONS OF ACTIVE PIPELINES | 2007 |
|
RU2352856C1 |
METHOD FOR REPAIR OF DEFECT SECTION OF OPERATING PIPELINE | 2007 |
|
RU2354522C2 |
COUPLING REPAIR METHOD OF PIPELINE (TECHNOLOGY BY KiATON COMPANY) (VERSIONS) | 2010 |
|
RU2449204C2 |
PROCEDURE FOR NON DESTRUCTIVE CHECK OF QUALITY AT COUPLING REPAIR OF PIPELINES | 2010 |
|
RU2430293C1 |
METHOD TO REPAIR DEFECTIVE SECTION OF OPERATING PIPELINE | 2006 |
|
RU2314453C1 |
METHOD FOR REPAIR OF PIPELINE DEFECTS | 2007 |
|
RU2374551C2 |
Authors
Dates
2012-05-20—Published
2008-07-07—Filed