METHOD TO ERECT SECTION OF ADJACENCY BETWEEN RUNNING TUNNEL OF SUBWAY LINE UNDER CONSTRUCTION AND RUNNING TUNNEL OF EXISTING LINE Russian patent published in 2012 - IPC E02D29/45 

Abstract RU 2460848 C1

FIELD: construction.

SUBSTANCE: method to erect a section of adjacency between a running tunnel of a subway line under construction to a running tunnel of an existing line includes erection of adjacency structures by making vertical walls from secant bored piles of the tunnel of the line under construction at both sides of existing tunnels, mining a pit with soil excavation, installation of struts from steel pipes with the possibility to ensure their resting against walls from secant bored piles, erection of a solid embracing cover with the possibility to ensure its resting in indents arranged on erected walls from secant bored piles, and with dismantling of a vertical wall of tunnel lining of an existing line at the side where a line under construction adjoins. Upon erection of a solid embracing cover, inside the tunnel of the existing line at the side where the tunnel of the line under construction adjoins, indents are cut in a track concrete with a rated pitch along axes of sleepers with width of more or equal to 650 mm, length equal to the width of the existing running tunnel and depth to the top of reinforcement frames of the tunnel tray. On the bottom of the indents a strengthening reinforcement is installed with length to the walls from secant bored piles, as well as a metal insulation along the indent width, which is rigidly joined with a tray by means of anchors with a pitch of 500 mm with subsequent concreting with the possibility to ensure shoulders for welding to the sheets of metal insulation of the adjacent indent. Metal insulation is brought out to the walls from secant bored piles with subsequent closure of insulation along the inner contour of adjacency and erection of a protective wall along the metal insulation. Then the track concrete is laid, as well as a rail sleeper grid on the adjacency section, afterwards backfilling with sand soil is carried out.

EFFECT: lower labour inputs and material intensity of works production when erecting a joint between a running tunnel of a subway line under construction and a running tunnel of an existing line.

5 dwg

Similar patents RU2460848C1

Title Year Author Number
PROCESS OF CONSTRUCTION OF CONTIGUITY OF TRANSFER TUNNEL OF BUILT LINE OF UNDERGROUND RAILWAY TO TRANSFER TUNNEL OF OPERATIONAL LINE 1994
  • Barskij E.S.
  • Zajdullin N.G.
  • Kotov V.V.
  • Koshelev Ju.A.
  • Nesterov V.S.
  • Alejnik M.I.
  • Romadina L.V.
  • Sandukovskij Eh.V.
  • Seslavinskij S.I.
  • Turenskij S.N.
RU2057939C1
METHOD OF CONSTRUCTION OF LINE OF SUBWAY OF SHALLOW DEPTH 0
  • Manyukova Nataliya Evgenevna
  • Bannikova Nadezhda Mikhajlovna
  • Berends Marina Konstantinovna
  • Khodosh Vladimir Aleksandrovich
  • Lappo Konstantin Borisovich
SU1794193A3
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS 1999
  • Aksenova O.I.
  • Alekseenko E.I.
  • Bessolov V.A.
  • Lubotskij S.Ju.
  • Maksimova V.N.
  • Millerman S.I.
  • Morozov I.A.
  • Nikolaev S.V.
  • Selivanov N.P.
  • Sinitskij G.M.
  • Chuverina S.G.
RU2152473C1
METHOD FOR ERECTION OF URBAN RING HIGHWAY SECTION MEGAPOLIS 1999
  • Arkhipkin N.I.
  • Zeliger I.A.
  • Kudrjashov V.I.
  • Kuz'Min A.V.
  • Kurakin P.P.
  • Muravin G.I.
  • Romanov P.S.
  • Samsonov A.V.
  • Svirskij S.I.
  • Selivanov N.P.
  • Tkachenko S.S.
  • Ugrinovich S.V.
  • Shvartsman V.L.
RU2152470C1
METHOD FOR ERECTING INTRA-CITY CIRCULAR MOTORWAY 1999
RU2175367C2
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL 2018
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Donenko Ekaterina Evgenevna
RU2692518C1
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS 2022
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Donenko Ekaterina Evgenevna
RU2779168C1
THREE-SPAN METRO STATION CONSTRUCTED IN ACCORDANCE WITH THE OPEN BUILDING METHOD WITH AN ISLAND PASSENGER PLATFORM AND SINGLE-TRACK RUNNING TUNNELS 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Fadeeva Vera Borisovna
  • Donenko Ekaterina Evgenevna
RU2746610C1
SINGLE-VAULT MULTILEVEL SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (P.B. YURKEVICH'S DESIGN) 2014
  • Jurkevich Pavel Borisovich
RU2562359C2
SUBWAY LINE IN DEEP URBAN AREAS 2023
  • Rubinchik Eduard Borisovich
  • Dzhantimirov Khristofor Avdeevich
  • Zvezdov Andrej Ivanovich
  • Novikov Andrej Evgenevich
  • Pankratenko Aleksandr Nikitovich
  • Rubinchik Dmitrij Aleksandrovich
  • Rudometkin Vladimir Viktorovich
RU2808273C1

RU 2 460 848 C1

Authors

Abramson Valerij Mikhajlovich

Barskij Efim Semenovich

Geperidze Aleksandr Otarievich

Lubotskij Sergej Jur'Evich

Makovskij Il'Ja Veniaminovich

Mints Artur Maksovich

Romadina Larisa Vasil'Evna

Shurgaja Tengiz Nadarovich

Dates

2012-09-10Published

2011-03-25Filed