FIELD: process engineering.
SUBSTANCE: prior to starting the works, base penetration of tamping pick is set with the help of control unit setting device to calculate penetration at every point of repaired track, depending upon rail height and tie sizes. Track section to be straightened can consist of two and more sections with different structural characteristics, for example, size "B" and "B1" of rails 3, 4. Then, in changing from one track to another, said base magnitude is varied by tamping pick penetration into ballast. Said base magnitude of tamping pick penetration in ballast may be preset and switched automatically by track straightening programme.
EFFECT: stable density of ballast.
7 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RAILWAY TRACK SLEEPER TAMPING AND MACHINE FOR ITS REALISATION | 2011 |
|
RU2468136C1 |
METHOD FOR TAMPING OF RAILWAY SLEEPERS | 2008 |
|
RU2372440C1 |
TAMPING METHOD OF RAILWAY TRACK CROSS-TIES | 2013 |
|
RU2534163C1 |
METHOD OF TIE TAMPING | 2006 |
|
RU2304654C1 |
METHOD FOR CONTINUOUS RAILWAY TRACK SLEEPER TAMPING AND MACHINE FOR ITS REALISATION | 2011 |
|
RU2480552C1 |
METHOD FOR TAMPING OF RAILWAY TRACK TIES (VERSIONS), TIE-TAMPING UNIT (VERSIONS) AND TAMPER FOR ITS REALISATION | 2007 |
|
RU2361031C2 |
TRACK MAINTAINER | 2000 |
|
RU2193616C2 |
METHOD FOR AUTOMATIC CORRECTION OF RAILWAY TRACK POSITION | 2019 |
|
RU2757104C1 |
REINFORCED CONCRETE SLEEPER | 2013 |
|
RU2536433C2 |
SYSTEM FOR CONTROL OF A GROUP OF TAMPING MACHINES | 2018 |
|
RU2704764C1 |
Authors
Dates
2013-01-10—Published
2011-01-20—Filed