FIELD: construction.
SUBSTANCE: structure for storage of liquids of large volumes on a heterogeneous base comprises a support foundation slab and a reservoir installed on it. The support foundation slab is made with an inclined foot, having alternating thickness with the thickening difference b=0÷1h in the area of the suggested tilt, where the h is the rated thickness of the support slab. The reservoir is installed with displacement of its centre, relative to the centre of the support foundation slab by the value a=0.1÷0.4(D2-D3) towards the side opposite to the direction of the suggested tilt, where D3 - reservoir diameter, D2 - diameter of the support foundation slab.
EFFECT: prevents reservoir tilting under cyclic loads in process of operation due to bringing of centre subsidence differences and reservoir edges to normative values.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
STRAIGHTENING METHOD FOR BUILDINGS AND BUILDING STRUCTURES ERECTED IN FOUNDATION SLABS | 2006 |
|
RU2318962C2 |
PROCEDURE CONTROLLING LIST AND SINKING OF SOLID MASS STRUCTURE | 2001 |
|
RU2211288C2 |
METHOD FOR CORRECTION OF VERTICAL POSITION OF BUILDINGS AND STRUCTURES ON PANEL-WALL FOUNDATION | 2007 |
|
RU2352723C1 |
BUILDING STRAIGHTENING METHOD | 2004 |
|
RU2275474C2 |
PLATE FOUNDATION UNDER TANK | 2017 |
|
RU2655457C1 |
METHOD OF ERECTING HIGH-RISE BUILDING ON NATURAL BASE | 2016 |
|
RU2634762C1 |
METHOD FOR FOUNDATION ENHANCING | 2015 |
|
RU2596621C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD TO CORRECT IRREGULARITIES OF BUILDINGS AND STRUCTURES SUBSIDENCE ON SLAB FOUNDATION | 2011 |
|
RU2468152C1 |
METHOD FOR ERECTION OF COMPREHENSIVE DEVELOPMENT BUILDING | 2008 |
|
RU2391464C2 |
Authors
Dates
2013-08-10—Published
2011-12-14—Filed