FIELD: oil and gas industry.
SUBSTANCE: method involves arrangement of an fibre-optic cable in a production well; determination of well shaft temperature; build-up of a temperature vs. well depth graph; indication on the graph of a temperature rise minimum by 10 degrees, which is the closest one to the well head; determination of depth of well liquid level as corresponding to depth of the indicated temperature rise.
EFFECT: determination of liquid level in a well with high temperature for extraction of high-viscosity oil.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING TEMPERATURE DISTRIBUTION IN AN OIL WELL WHICH PRODUCES SUPER-VISCOUS OIL | 2020 |
|
RU2731777C1 |
METHOD FOR OPERATING PAIRED WELLS PRODUCING HIGH-VISCOSITY OIL WITH FORMATION PRESSURE MAINTENANCE | 2022 |
|
RU2792484C1 |
METHOD OF OPERATING PAIRED WELLS PRODUCING HIGH-VISCOSITY OIL | 2023 |
|
RU2806972C1 |
METHOD OF OPERATING A PAIR OF WELLS PRODUCING HIGH-VISCOSITY OIL | 2019 |
|
RU2713277C1 |
METHOD FOR OPERATING A PAIR OF WELLS FOR PRODUCING HIGH-VISCOSITY OIL | 2019 |
|
RU2744609C1 |
METHOD OF OPERATING PAIR OF WELLS PRODUCING HIGH-VISCOSITY OIL | 2015 |
|
RU2584437C1 |
METHOD FOR OPERATING A PAIR OF WELLS PRODUCING HIGH-VISCOSITY OIL | 2023 |
|
RU2803327C1 |
METHOD FOR OPERATING PAIR OF WELLS FOR PRODUCTION OF HIGH-VISCOSITY OIL | 2019 |
|
RU2752641C2 |
METHOD OF OPERATION OF PAIR OF WELLS PRODUCING HIGH-VISCOSITY OIL, WITH INJECTION STOP | 2020 |
|
RU2733251C1 |
METHOD FOR DEVELOPMENT OF PAIRED HORIZONTAL WELLS PRODUCING HIGH-VISCOSITY OIL | 2020 |
|
RU2724707C1 |
Authors
Dates
2013-09-27—Published
2012-10-19—Filed