FIELD: construction.
SUBSTANCE: for formation and compaction of a ballast section, ballast is fully cut out with its further cleaning and backfilling of the bottom layer that is levelled and compacted. An upper crushed stone layer is backfilled onto the bottom layer and compacted. The lower crushed stone layer is backfilled to the thickness of 0.7H<H1≤0.85H. The upper layer is backfilled to the thickness of H2=(1.2÷1.25)H-H1, where H - ballast cut-out depth below a sleeper bed level. After each layer is laid, compaction is performed with series action of a liner-tamper-surfacer of continuous action, a liner-tamper-planisher and a dynamic stabiliser.
EFFECT: improving compaction quality of a ballast section when performing rehabilitation and repair of a railway with crushed stone cleaning.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECOVERY OF BALLAST SECTION | 2015 |
|
RU2579246C1 |
METHOD FOR AUTOMATIC QUALITY CONTROL OF RAIL TRACK BALLAST LAYER SEAL AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2703819C1 |
METHOD FOR STRENGTHENING THE MAIN PLATFORM OF THE RAILWAY ROADBED | 2021 |
|
RU2766844C1 |
METHOD TO REINFORCE RAILWAY TRACK | 2010 |
|
RU2448212C2 |
METHOD OF VOLUMETRIC COMPACTION OF TRACK BALLAST SECTION | 2009 |
|
RU2400589C1 |
METHOD TO REINFORCE RAILWAY TRACK | 2013 |
|
RU2535378C1 |
METHOD FOR CONTROLLING THE PROCESS OF COMPACTION OF THE BALLAST LAYER OF THE RAIL TRACK | 2021 |
|
RU2765725C1 |
OUTHANG OF SLEEPER | 2017 |
|
RU2646703C1 |
REINFORCED CONCRETE SLEEPER | 2013 |
|
RU2536433C2 |
MACHINE TO STRAIGHTEN RAIL TRACK | 2008 |
|
RU2378441C1 |
Authors
Dates
2015-03-27—Published
2014-01-31—Filed